Roadside Telecommunications (RS-TC)
| Subsystem/Unit Cost Element |
IDAS No.[1] |
Lifetime (years)[2] |
Low Capital Cost ($K) |
High Capital Cost ($K) |
Cost Date |
Low O&M Cost ($K/year) |
High O&M Cost ($K/year) |
Cost Date |
Notes |
DS0 Communication Line
| TC001 |
20 |
0.5 |
1 |
1995 |
0.6 |
1.2 |
2003 |
56 Kbps capacity. Leased with typical distance from terminus to terminus of 8–15 miles, but most of the cost is not distance sensitive. |
| DS1 Communication Line |
TC002 |
20 |
0.5 |
1 |
1995 |
4.8 |
8.4 |
2002 |
1.544 Mbps capacity (T1 line). Leased with typical distance from terminus to terminus of 8–15 miles, but most of the cost is not distance sensitive. |
| DS3 Communication Line |
TC003 |
20 |
3 |
5 |
1995 |
24 |
72 |
2001 |
44.736 Mbps capacity (T3 line). Leased with typical distance from terminus to terminus of 8–15 miles, but most of the cost is not distance sensitive. |
| ISP Service Fee |
TC007 |
 |
 |
 |
 |
0.18 |
0.6 |
2002 |
Monthly service fee ranges from $15 per month for regular dial-up service to $50 per month for DSL. |
| Direct Bury Armor Encased Fiber Cable |
 |
 |
60 |
60 |
1999 |
0.02 |
0.02 |
1999 |
Cost is per mile. Includes cable and installation. |
| Conduit Design and Installation–Corridoring |
 |
20 |
50 |
65 |
2003 |
0.02 |
0.02 |
1999 |
Cost is per mile. Includes boring, trench, and conduit (3 or 4 inch). Cost would be significantly less for an aerial installation. In-ground installation would cost significantly less if implemented in conjunction with a construction project. |
| Twisted Pair Installation |
 |
20 |
12 |
12 |
1999 |
0.02 |
0.02 |
1999 |
Cost is per mile. |
| Fiber Optic Cable Installation |
 |
20 |
20 |
50 |
2003 |
0.02 |
0.02 |
1999 |
Cost is per mile for cable and in-ground installation. Cost would be significantly less for an aerial installation. In-ground installation would cost significantly less if implemented in conjunction with a construction project. |
| Cellular Communication |
 |
 |
0.5 |
0.5 |
1999 |
0.3 |
0.4 |
1999 |
Cost is for one unit. |
| 900 MHz Spread Spectrum Radio |
 |
10 |
9 |
9 |
1999 |
0.15 |
0.4 |
1999 |
Cost is per link. |
| Microwave Communication |
 |
10 |
10 |
20 |
2002 |
0.5 |
1 |
2002 |
Cost is per link. Cost could be higher depending on tower/antenna installation. |
| Wireless Communications, Low Usage |
TC004 |
 |
 |
 |
 |
0.12 |
0.2 |
2003 |
125 Kbytes/month available usage (non-continuous use). |
| Wireless Communications, Medium Usage |
TC005 |
 |
 |
 |
 |
0.6 |
0.7 |
1995 |
1,000 Kbytes/month available usage (non-continuous use). |
| Wireless Communications, High Usage |
 |
20 |
0.5 |
1 |
1995 |
1.2 |
1.8 |
2002 |
3,000 Kbytes/month available usage (non-continuous use). |
| Call Box |
 |
10 |
4 |
5.9 |
2002 |
0.714 |
0.714 |
1999 |
Capital cost includes call box and installation. O&M is cost per unit (per year) for service maintenance contract and annual cellular service fee. |
Roadside Detection (RS-D)
| Subsystem/Unit Cost Element |
IDAS No.[1] |
Lifetime (years)[2] |
Low Capital Cost ($K) |
High Capital Cost ($K) |
Cost Date |
Low O&M Cost ($K/year) |
High O&M Cost ($K/year) |
Cost Date |
Notes |
| Inductive Loop Surveillance on Corridor |
 |
5 |
3 |
8 |
2001 |
0.5 |
0.8 |
1995 |
Double set (four loops) with controller, power, etc. |
| Inductive Loop Surveillance at Intersection |
 |
5 |
9 |
16 |
2003 |
1 |
1.6 |
1999 |
Four legs, two lanes/approach. |
| Machine Vision Sensor on Corridor |
 |
10 |
21.7 |
29 |
2003 |
0.2 |
0.4 |
2003 |
One sensor both directions of travel. Does not include installation. |
| Machine Vision Sensor at Intersection |
 |
10 |
20 |
25.7 |
2003 |
0.2 |
0.5 |
2003 |
Four-way intersection, one camera per approach. Does not include installation. |
| Passive Acoustic Sensor on Corridor |
 |
 |
3.7 |
8 |
2002 |
0.2 |
0.4 |
1998 |
Cost range is for a single sensor covering up to five lanes. Low cost is for basic sensor, which consists of the sensor, mounting kit, junction box, and cabinet termination card. High cost includes basic sensor with solar and wireless option. This option consists of an antenna, solar charger, battery, and panel, and wireless base station, which will handle up to eight sensors. Capital costs do not include installation or mounting structure. |
| Passive Acoustic Sensor at Intersection |
 |
 |
5 |
15 |
2001 |
0.2 |
0.4 |
2002 |
Four sensors, four leg intersection. |
| Remote Traffic Microwave Sensor on Corridor |
 |
10 |
3.3 |
6 |
2002 |
0.1 |
0.1 |
2001 |
One sensor both directions of travel. Includes installation. |
| Remote Traffic Microwave Sensor at Intersection |
 |
10 |
18 |
 |
2001 |
0.1 |
0.1 |
2001 |
Four sensors, four leg intersection. Includes installation. |
| Infrared Sensor Active |
 |
 |
6 |
7.5 |
2000 |
 |
 |
 |
Sensor detects movement in two directions and determines vehicle speed, classification, and lane position. |
| Infrared Sensor Passive |
 |
 |
0.7 |
1.2 |
2002 |
 |
 |
 |
Sensor covers one lane and detects vehicle count, volume, and classification. |
| CCTV Video Camera |
RS007 |
10 |
7.5 |
17 |
2003 |
1.5 |
2.4 |
2001 |
Cost includes color video camera with pan, tilt, and zoom (PTZ). Includes installation. |
| CCTV Video Camera Tower |
RS008 |
20 |
4 |
12 |
2003 |
 |
 |
 |
Low cost is for a 35 ft. tower. High cost is for 90 ft. tower. Includes foundation, pole, conduit, and labor. |
| Pedestrian Detection Microwave |
 |
 |
0.6 |
0.6 |
2001 |
 |
 |
 |
Cost is per device. Typical deployment consists of two devices per crosswalk for detection of pedestrian in crosswalk. Can be used for detection of pedestrian at the curbside. |
| Pedestrian Detection Infrared |
 |
 |
0.3 |
0.5 |
2002 |
 |
 |
 |
Cost is per device. Does not include installation. Typical deployment consists of two devices per crosswalk for detection of pedestrian at the sidewalk. Can be used for detection of pedestrian in the crosswalk. |
| Environmental Sensing Station (Weather Station) |
 |
25 |
30 |
50 |
2003 |
1.9 |
4.1 |
2003 |
Environmental Sensing Station (ESS), also known as a weather station, consists of pavement temperature sensor, subsurface temperature sensor, precipitation sensor (type and rate), wind sensor (speed and direction), air temperature and humidity sensors, visibility sensors, and remote processing unit (RPU). ESS provide condition data and are basic
components of larger Road Weather Information Systems (see RWIS under TMC subsystem). RPU replaced every five years at $6.4K. O&M includes calibration, equipment repairs, and replacement of damaged equipment. O&M costs could be higher if state provided maintenance. |
| Traffic Camera for Red Light Running Enforcement |
 |
 |
75 |
136 |
2001 |
60 |
60 |
2001 |
Low capital range is for a 35-mm wet film camera, which includes installation of the camera ($25K) and associated equipment (e.g., pole, loop detectors, cabinet foundation). High capital range is for digital camera, which includes a total of two cameras for a three-lane approach. O&M cost is for one 35-mm wet film camera per year. Note, most jurisdictions contract with a vendor to install and maintain, and process the back office functions of the RLR system. The vendor receives compensation from fines charged to violators. |
| Lowering System |
 |
20 |
8 |
10.5 |
2003 |
 |
 |
 |
Cost includes the lowering system and the pole (pole height ranging 40 ft. to 70 ft.). Installation costs not included. The lowering system is mechanically operated; requires routine lubrication. |
| Portable Speed Monitoring System |
 |
15 |
5 |
15 |
2002 |
 |
 |
 |
Trailer mounted two-digit dynamic message sign, radar gun, computer; powered by generator or operates off of solar power; and requires minimal operations and maintenance work. The system determines a vehicle's speed with the radar gun and displays the current speed, in real time, and also stores the speeds in a computer for further analysis. |
| Portable Traffic Management System |
 |
 |
80 |
100 |
2003 |
 |
 |
 |
This portable unit collects traffic data, communicates with a central control facility, and displays real-time traffic information to travelers. The system includes a trailer mounted dynamic message sign and mast equipped with a PTZ video camera, sensors, and wireless communications. Cost will vary depending on the type and number of traffic sensors installed. |
Roadside Control (RS-C)
| Subsystem/Unit Cost Element |
IDAS No.[1] |
Lifetime (years)[2] |
Low Capital Cost ($K) |
High Capital Cost ($K) |
Cost Date |
Low O&M Cost ($K/year) |
High O&M Cost ($K/year) |
Cost Date |
Notes |
| Linked Signal System LAN |
RS002 |
20 |
40 |
70 |
1995 |
0.4 |
0.8 |
1995 |
This element provides the connections to the linked signal system. |
| Signal Controller Upgrade for Signal Control |
RS003 |
20 |
2.5 |
6 |
2003 |
0.2 |
0.5 |
1995 |
Local controller upgrade to provide advanced signal control. |
| Signal Controller and Cabinet |
 |
 |
8 |
15 |
2003 |
0.2 |
0.5 |
2001 |
Includes installation of traffic signal controller and cabinet per intersection. |
| Traffic Signal |
 |
 |
95 |
115 |
2001 |
2.4 |
3 |
1999 |
Includes installation for one signal (four-leg intersection), conduit, controller, and detection device. Cost ranges from traffic signal with inductive loop detection (low) to non-intrusive detection (high). |
| Signal Preemption Receiver |
RS004 |
5 |
2 |
8 |
1995 |
0.05 |
0.2 |
1995 |
Two per intersection. Complement of IDAS elements RS005 and TV004. |
| Signal Controller Upgrade for Signal Preemption |
RS005 |
10 |
2 |
5 |
1995 |
 |
 |
 |
Add-on to base capability (per intersection). Complement of IDAS elements RS004 and TV004. |
| Roadside Signal Preemption/Priority |
 |
 |
2.5 |
5.5 |
2003 |
 |
 |
 |
Includes infrared detector, detector cable, phase selector, and system software. Capital costs range is for two directions (low) and four directions (high). Does not include installation costs. Complement to transit (or emergency vehicle) on-board Signal Preemption/Priority Emitter. |
| Ramp Meter |
RS006 |
5 |
25 |
50 |
2003 |
1.2 |
2.8 |
2003 |
Includes ramp meter assembly, signal displays, controller, cabinet, detection, and optimization. |
| Software for Lane Control |
RS011 |
20 |
25 |
50 |
1995 |
2.5 |
5 |
1995 |
Software and hardware at site. Software is off-the-shelf technology and unit price does not reflect product development. |
| Lane Control Gates |
RS012 |
20 |
100 |
150 |
1995 |
2 |
3 |
1995 |
Per location. |
| Fixed Lane Signal |
RS009 |
20 |
6 |
8 |
1995 |
0.6 |
0.8 |
1995 |
Cost per signal. |
| Automatic Anti-Icing System Short Span |
 |
12 |
25 |
25 |
1998 |
2 |
2 |
1998 |
Typical automatic anti-icing system consists of a control system, chemical storage tank, distribution lines, pump, and nozzles. Pump and control hardware replaced every five years at cost of $3.5K. For a short span system ranging from 120 to 180 feet. O&M includes system maintenance, utilities, materials, and labor. |
| Automatic Anti-Icing System Long Span |
 |
12 |
50 |
495 |
1999 |
1.5 |
29.5 |
1999 |
Typical automatic anti-icing system consists of a control system, chemical storage tank, distribution lines, pump, and nozzles. Pump and control hardware replaced every five years at cost of $3.5K. For a long span system ranging from 320 feet to greater than 1/2 mile. O&M includes system maintenance, utilities, materials, and labor. The high O&M cost is for a much larger system, hence the need for a greater amount of materials. |
Roadside Information (RS-I)
| Subsystem/Unit Cost Element |
IDAS No.[1] |
Lifetime (years)[2] |
Low Capital Cost ($K) |
High Capital Cost ($K) |
Cost Date |
Low O&M Cost ($K/year) |
High O&M Cost ($K/year) |
Cost Date |
Notes |
| Roadside Message Sign |
RS010 |
20 |
50 |
75 |
1995 |
2.5 |
3.75 |
1995 |
Fixed message board for HOV and HOT lanes. |
| Wireline to Roadside Message Sign |
RS013 |
20 |
6 |
9 |
1995 |
 |
 |
 |
Wireline to VMS (0.5 mile upstation). |
| Variable Message Sign |
RS015 |
20 |
48 |
120 |
2003 |
2.4 |
6 |
2003 |
Low capital cost is for smaller VMS installed along arterial. High capital cost is for full matrix, LED, three-line, walk-in VMS installed on freeway. Cost does not include installation. |
| Variable Message Sign Tower |
RS016 |
20 |
25 |
120 |
2003 |
 |
 |
 |
Low capital cost is for a small structure for arterials. High capital cost is for a larger structure spanning three to four lanes. VMS tower structure requires minimal maintenance. |
| Variable Message Sign–Portable |
 |
14 |
21.5 |
25.5 |
2002 |
1.2 |
2 |
2000 |
Trailer mounted VMS (three-line, 8" character display); includes trailer, solar or diesel powered. |
| Highway Advisory Radio |
RS017 |
20 |
16 |
32 |
2001 |
0.6 |
1 |
2001 |
Capital cost is for a 10-watt HAR. Includes processor, antenna, transmitters, battery back-up, cabinet, rack mounting, lighting, mounts, connectors, cable, and license fee. Super HAR costs an additional $9–10K (larger antenna). Primary use of the super HAR is to gain a stronger signal. |
| Highway Advisory Radio Sign |
 |
10 |
5 |
9 |
2003 |
0.25 |
0.25 |
2003 |
Cost is for a HAR sign with flashing beacons. Includes cost of the controller. |
| Roadside Probe Beacon |
RS020 |
5 |
5 |
8 |
2001 |
0.5 |
0.8 |
2001 |
Two-way device (per location). |
| LED Countdown Signal |
 |
10 |
0.325 |
0.45 |
2001 |
 |
 |
 |
Costs range from low (two 12 x 12-inch dual housing unit) to high (16 x 18-inch single housed unit). Signal indicates time remaining for pedestrian to cross, and a walk or don't walk icon. Countdown signals use low eight-watt LED bulbs, which require replacement approximately every five to seven years. |
| Pedestrian Crossing Illumination System |
 |
5 |
27.5 |
42 |
2003 |
2.75 |
4.2 |
2001 |
The capital cost range includes cost of equipment and installation. Equipment includes fixtures—four lamps per lane—for a three-lane crosswalk, controller, pole, and push button activator. Installation is estimated at 150–200% of the total equipment cost. Capital cost would be greater if the system included automated activation of the in-pavement lighting system. O&M is approximately 10% of the equipment cost. |
| Variable Speed Display Sign |
 |
 |
3.7 |
5 |
2001 |
 |
 |
 |
Low range is for a variable speed limit display system. High range includes static speed sign, speed detector (radar), and display system. |
Emergency Response Center (ER)
| Subsystem/Unit Cost Element |
IDAS No.[1] |
Lifetime (years)[2] |
Low Capital Cost ($K) |
High Capital Cost ($K) |
Cost Date |
Low O&M Cost ($K/year) |
High O&M Cost ($K/year) |
Cost Date |
Notes |
| Basic Facilities, Comm for Large Area |
EM006 |
 |
4,000 |
4,000 |
1995 |
400 |
600 |
1995 |
For population >750,000. Based on purchase of building rather than leasing space. Communications includes communications equipment internal to the facility such as equipment racks, multiplexers, modems, etc. |
| Basic Facilities, Comm for Medium Area |
EM007 |
 |
3,200 |
3,200 |
1995 |
400 |
480 |
1995 |
For population <750,000 and >250,000. Based on purchase of building rather than leasing space. Communications includes communications equipment internal to the facility such as equipment racks, multiplexers, modems, etc. |
| Basic Facilities, Comm for Small Area |
EM008 |
 |
2,800 |
2,800 |
1995 |
400 |
420 |
1995 |
For population <250,000. Based on purchase of building rather than leasing space. Communications includes communications equipment internal to the facility such as equipment racks, multiplexers, modems, etc. |
| Emergency Response Hardware |
EM001 |
5 |
6 |
9 |
2003 |
0.12 |
0.18 |
2003 |
Includes three workstations. O&M is estimated at 2% of capital cost. |
| Emergency Response Software |
EM002 |
10 |
70 |
150 |
1995 |
0.5 |
3.5 |
1995 |
Includes emergency response plans database, vehicle tracking software, and real-time traffic coordination. |
| Emergency Response Labor |
EM003 |
 |
 |
 |
 |
50 |
165 |
1995 |
Two people. Salary costs are fully loaded including salary, overtime, overhead, benefits, etc. |
| Emergency Management Communications Software |
EM004 |
20 |
5 |
10 |
1995 |
2.5 |
5 |
1995 |
Shared database between four sites. Cost is per site; software is COTS. |
| Hardware, Software Upgrade for E-911 and Mayday |
EM005 |
10 |
105 |
180 |
1995 |
1.7 |
2.5 |
1995 |
Data communications translation software, E911 interface software, processor, and three workstations. |
| 800 MHz. Two-way Radio |
 |
5 |
0.8 |
1.7 |
2001 |
0.09 |
0.12 |
2001 |
Cost is per radio. |
Information Service Provider (ISP)
| Subsystem/Unit Cost Element |
IDAS No.[1] |
Lifetime (years)[2] |
Low Capital Cost ($K) |
High Capital Cost ($K) |
Cost Date |
Low O&M Cost ($K/year) |
High O&M Cost ($K/year) |
Cost Date |
Notes |
| Basic Facilities, Comm for Large Area |
IS019 |
 |
4,000 |
4,000 |
1995 |
400 |
600 |
1995 |
For population >750,000 (stand-alone). Based on purchase of building rather than leasing space. Communications includes communications equipment internal to the facility such as equipment racks, multiplexers, modems, etc. |
| Basic Facilities, Comm for Medium Area |
IS020 |
 |
3,200 |
3,200 |
1995 |
400 |
480 |
1995 |
For population <750,000 and >250,000 (stand-alone). Based on purchase of building rather than leasing space. Communications includes communications equipment internal to the facility such as equipment racks, multiplexers, modems, etc. |
| Basic Facilities, Comm for Small Area |
IS021 |
 |
2,800 |
2,800 |
1995 |
400 |
420 |
1995 |
For population <250,000 (stand-alone). Based on purchase of building rather than leasing space. Communications includes communications equipment internal to the facility such as equipment racks, multiplexers, modems, etc. |
| Information Service Provider Hardware |
IS001 |
5 |
26 |
35 |
2003 |
0.5 |
0.7 |
2003 |
Includes two servers and five workstations. O&M is estimated at 2%; could be higher for responsive and preventative maintenance. |
| Systems Integration |
IS017 |
20 |
90 |
110 |
1998 |
 |
 |
 |
Integration with other systems. |
| Information Service Provider Software |
IS002 |
20 |
275 |
550 |
1995 |
13.75 |
27.5 |
1995 |
Includes database software (COTS) and traffic analysis software. |
| Map Database Software |
IS003 |
2 |
15 |
30 |
2003 |
 |
 |
 |
Software is COTS. |
| Information Service Provider Labor |
IS004 |
 |
 |
 |
 |
175 |
250 |
1995 |
Two staff at $50K to $75K and one staff at $75K to $100K. Salary cost are fully loaded prices and include base salary, overtime, overhead, benefits, etc. |
| FM Subcarrier Lease |
IS005 |
 |
 |
 |
 |
120 |
240 |
1995 |
Cost is per year. |
| Hardware Upgrade for Interactive Information |
IS006 |
5 |
12 |
16 |
2003 |
0.24 |
0.32 |
2003 |
Includes one server and two workstations. O&M is estimated at 2%; could be higher for responsive and preventative maintenance. |
| Software Upgrade for Interactive Information |
IS007 |
20 |
250 |
500 |
1995 |
12.5 |
25 |
1995 |
Trip planning software (includes some development costs). |
| Added Labor for Interactive Information |
IS008 |
 |
 |
 |
 |
100 |
150 |
1995 |
One staff at $50K to $75K for two shifts. Salary cost are fully loaded prices including base salary, overtime, overhead, benefits, etc. |
| Software Upgrade for Route Guidance |
IS009 |
20 |
250 |
500 |
1995 |
12.5 |
25 |
1995 |
Route selection software. Software is COTS. |
| Map Database Upgrade for Route Guidance |
IS010 |
2 |
100 |
200 |
1995 |
 |
 |
 |
Map database software upgrade. |
| Hardware Upgrade for Emergency Route Planning |
IS011 |
5 |
8 |
10 |
2003 |
0.16 |
0.2 |
2003 |
Includes one server. O&M is estimated at 2%; could be higher for responsive and preventative maintenance. |
| Software Upgrade for Emergency Route Planning |
IS012 |
20 |
50 |
100 |
1995 |
2.5 |
5 |
1995 |
Route guidance software. Software is COTS. |
| Hardware Upgrade for Dynamic Ridesharing |
IS013 |
5 |
4 |
6 |
2003 |
0.08 |
0.12 |
2003 |
Includes two workstations. O&M is estimated at 2%; could be higher for responsive and preventative maintenance. |
| Software Upgrade for Dynamic Ridesharing |
IS014 |
20 |
100 |
200 |
1998 |
5 |
10 |
1995 |
Software includes some development cost. |
| Added Labor for Dynamic Ridesharing |
IS015 |
 |
 |
 |
 |
100 |
150 |
1995 |
One staff at $50K to $75K for two shifts. Salary cost are fully loaded prices including base salary, overtime, overhead, benefits, etc. |
| Liability Insurance for Dynamic Ridesharing |
IS016 |
 |
 |
 |
 |
50 |
100 |
1995 |
$50K to $100K per year. |
| Software Upgrade for Probe Information Collection |
IS018 |
20 |
250 |
500 |
1995 |
12.5 |
25 |
1995 |
Software includes COTS and some development cost. |
Transportation Management Center (TM)
| Subsystem/Unit Cost Element |
IDAS No.[1] |
Lifetime (years)[2] |
Low Capital Cost ($K) |
High Capital Cost ($K) |
Cost Date |
Low O&M Cost ($K/year) |
High O&M Cost ($K/year) |
Cost Date |
Notes |
| Basic Facilities, Comm for Large Area |
TM040 |
 |
3,500 |
8,000 |
2003 |
350 |
1,200 |
2003 |
For population >750,000. Based on purchase of building rather than leasing space. Communications includes communications equipment internal to the facility such as equipment racks, multiplexers, modems, etc. O&M is estimated at 10–15% of the capital cost. |
| Basic Facilities, Comm for Medium Area |
TM041 |
 |
3,200 |
3,200 |
1995 |
400 |
480 |
1995 |
For population <750,000 and >250,000. Based on purchase of building rather than leasing space. Communications includes communications equipment internal to the facility such as equipment racks, multiplexers, modems, etc. O&M is estimated at 10–15% of the capital cost. |
| Basic Facilities, Comm for Small Area |
TM042 |
 |
2,800 |
2,800 |
1995 |
400 |
420 |
1995 |
For population <250,000. Based on purchase of building rather than leasing space. Communications includes communications equipment internal to the facility such as equipment racks, multiplexers, modems, etc. O&M is estimated at 10–15% of the capital cost. |
| Hardware for Signal Control |
TM001 |
5 |
18.5 |
28.5 |
2003 |
9 |
10.5 |
2003 |
Includes one server and multiple workstations. O&M includes responsive and preventative maintenance. |
| Software, Integration for Signal Control |
TM006 |
5 |
105 |
150 |
2003 |
150 |
150 |
2003 |
Software and integration for a large urban area. Cost would be lower (approx. $10,500) for a few arterial intersections. O&M includes software upgrades, revisions, and expansion of the system. |
| Labor for Signal Control |
TM002 |
 |
 |
 |
 |
486 |
594 |
2001 |
Costs include labor for operations (two at 50% of the time, at $100K), transportation engineer (one at 50% of the time, at $100K), update timing plans ($2K per system per month for every 10 systems), and signal maintenance technician (two at $75K). Salary cost are fully loaded prices including base salary, overtime, overhead, benefits, etc. |
| Hardware, Software for Traffic Surveillance |
TM003 |
20 |
135 |
165 |
1995 |
6.75 |
8.25 |
1995 |
Processor and software. |
| Integration for Traffic Surveillance |
TM032 |
20 |
225 |
275 |
1995 |
11.25 |
13.75 |
1995 |
Integration with other systems. |
| Hardware for Freeway Control |
TM004 |
5 |
6 |
9 |
2003 |
0.3 |
0.45 |
2003 |
Includes three workstations. O&M estimated at 5% of capital cost. |
| Software, Integration for Freeway Control |
TM007 |
5 |
180 |
220 |
2002 |
 |
 |
 |
Software and integration, installation and one year maintenance. Software is off-the-shelf technology and unit cost does not reflect product development. |
| Labor for Freeway Control |
TM005 |
 |
 |
 |
 |
225 |
275 |
2001 |
Labor for operations (two at 50% of $100K) and maintenance technicians (two at $75K). Salary cost are fully loaded prices including base salary, overtime, overhead, benefits, etc. |
| Hardware for Lane Control |
TM008 |
5 |
2 |
3 |
2003 |
0.1 |
0.15 |
2003 |
Includes one workstation and 19" monitor. O&M estimated at 5% of capital cost. |
| Software, Integration for Lane Control |
TM009 |
10 |
225 |
275 |
1995 |
11.25 |
13.75 |
1995 |
Software development and integration and software upgrade for controllers. Software development is fine tune adjustments for local installations. Otherwise, software is COTS. |
| Labor for Lane Control |
TM010 |
 |
 |
 |
 |
90 |
110 |
2001 |
Labor for two operators at 50% of $100K. |
| Software, Integration for Regional Control |
TM011 |
10 |
300 |
400 |
1998 |
 |
 |
 |
Software and integration, installation and one year maintenance. Integration with other TMC's. Software is COTS. |
| Real-time, Traffic Adaptive Signal Control System |
 |
10 |
120 |
150 |
2001 |
20 |
20 |
2001 |
The costs range is based on commercially available packages, which run on a centralized computer. The high capital cost includes software packages for graphical user interface and incident management. |
| Labor for Regional Control |
TM012 |
 |
 |
 |
 |
180 |
220 |
2001 |
Labor for operators (two at 50% of $100K), transportation engineer (one at 50% of $100K), and maintenance contract. Salary costs are fully loaded prices including base salary, overtime, overhead, benefits, etc. |
| Video Monitors, Wall for Incident Detection |
TM013 |
15 |
57 |
103 |
2003 |
3 |
5 |
2003 |
Video wall and monitors. O&M estimated at 5% of capital cost. |
| Hardware for Incident Detection |
TM014 |
5 |
43 |
57 |
2003 |
2.15 |
2.85 |
2003 |
Includes four servers, five workstations, and two laser printers. O&M estimated at 5% of capital cost; could be higher for responsive and preventative maintenance. |
| Integration for Incident Detection |
TM025 |
20 |
90 |
110 |
1995 |
4.5 |
5.5 |
1995 |
Integration with other systems. |
| Software for Incident Detection |
TM015 |
5 |
90 |
110 |
2002 |
4.5 |
5.5 |
2002 |
Software is COTS and includes development cost. O&M is estimated at 5% of capital. |
| Labor for Incident Detection |
TM016 |
 |
 |
 |
 |
630 |
770 |
2001 |
Labor for operators (four at $100K and one manager at $150K) and two maintenance techs at $75K. |
| Video Monitor for Incident Response |
TM017 |
5 |
0.6 |
1.5 |
2003 |
 |
 |
 |
Includes one 19" monitor. |
| Hardware for Incident Response |
TM018 |
5 |
2 |
3 |
2003 |
0.1 |
0.15 |
2003 |
Includes one workstation. O&M estimated at 5% of capital cost. |
| Integration for Incident Response |
TM026 |
20 |
180 |
220 |
1995 |
 |
 |
 |
Integration with other systems. |
| Software for Incident Response |
TM019 |
2 |
13.5 |
16.5 |
1995 |
0.675 |
0.825 |
1995 |
Software is COTS. |
| Labor for Incident Response |
TM020 |
 |
 |
 |
 |
90 |
110 |
2001 |
Labor for incident management coordinator (one at $100K). |
| Automated Incident Investigation System |
 |
5 |
15 |
15 |
2001 |
 |
 |
 |
Includes workstation, tripod, monopole antenna, Auto Integration, and AutoCAD software. |
| Hardware for Traffic Information Dissemination |
TM021 |
5 |
2 |
3 |
2003 |
0.1 |
0.15 |
2003 |
Includes one workstation. O&M estimated at 5% of capital cost. |
| Software for Traffic Information Dissemination |
TM022 |
5 |
18 |
22 |
1995 |
0.9 |
1.1 |
1995 |
Software is COTS. |
| Integration for Traffic Information Dissemination |
TM023 |
20 |
90 |
110 |
2000 |
4.5 |
5.5 |
1995 |
Integration with other systems. |
| Labor for Traffic Information Dissemination |
TM024 |
 |
 |
 |
 |
90 |
110 |
2001 |
Labor for one operator at $100K. Salary costs are fully loaded and include base salary, overtime, overhead, benefits, etc. |
| Software for Dynamic Electronic Tolls |
TM027 |
5 |
22.5 |
27.5 |
1995 |
1.125 |
1.375 |
1995 |
Includes software installation and one year maintenance. Software is COTS. |
| Integration for Dynamic Electronic Tolls |
TM028 |
20 |
90 |
110 |
1995 |
4.5 |
5.5 |
1995 |
Integration with other systems. |
| Hardware for Probe Information Collection |
TM033 |
3 |
2 |
3 |
2003 |
0.1 |
0.15 |
2003 |
Includes one workstation. O&M estimated at 5% of capital cost. |
| Software for Probe Information Collection |
TM034 |
5 |
18 |
22 |
1995 |
1.8 |
2.2 |
1995 |
Includes software installation and one year maintenance. Software is COTS. |
| Integration for Probe Information Collection |
TM035 |
20 |
135 |
165 |
1995 |
13.5 |
16.5 |
1995 |
Integration with other systems. |
| Labor for Probe Information Collection |
TM036 |
 |
 |
 |
 |
45 |
55 |
2001 |
Labor for one operator (four hours per day at $100K/year). Salary costs are fully loaded prices and include base salary, overtime, overhead, benefits, etc. |
| Software for Rail Crossing Monitor |
TM037 |
5 |
18 |
22 |
1995 |
1.8 |
2.2 |
1995 |
Includes software installation and one year maintenance. Software is COTS. |
| Integration for Rail Crossing Monitor |
TM038 |
20 |
90 |
110 |
1995 |
 |
 |
 |
Integration with other systems. |
| Labor for Rail Crossing Monitor |
TM039 |
 |
 |
 |
 |
45 |
55 |
2001 |
Operators (one at 50% of $100K). Salary costs are fully loaded prices including base salary, overtime, overhead, benefits, etc. |
| Road Weather Information System (RWIS) |
 |
25 |
25 |
25 |
1998 |
0.4 |
2.5 |
2001 |
An RWIS consists of several components: an environmental sensing station (ESS), CPU, workstation with RWIS software, and communications equipment. All components of the RWIS reside at the TMC with the exception of the ESS. See Roadside Detection subsystem for costs of ESS. Cost of the ESS ($10K–$50K) should be added to $25K listed here in order to cost out the entire system. CPU replaced every 5 years at a cost of $4K. O&M costs range includes communication, and optional weather forecast/meteorological service. |
Transit Management Center (TR)
| Subsystem/Unit Cost Element |
IDAS No.[1] |
Lifetime (years)[2] |
Low Capital Cost ($K) |
High Capital Cost ($K) |
Cost Date |
Low O&M Cost ($K/year) |
High O&M Cost ($K/year) |
Cost Date |
Notes |
| Basic Facilities, Comm for Large Area |
TR014 |
 |
4,000 |
4,000 |
1995 |
400 |
600 |
1995 |
For population >750,000. Based on purchase of building rather than leasing space. Communications includes communications equipment internal to the facility such as equipment racks, multiplexers, modems, etc. |
| Basic Facilities, Comm for Medium Area |
TR015 |
 |
3,200 |
3,200 |
1995 |
400 |
480 |
1995 |
For population <750,000 and >250,000. Based on purchase of building rather than leasing space. Communications includes communications equipment internal to the facility such as equipment racks, multiplexers, modems, etc. |
| Basic Facilities, Comm for Small Area |
TR016 |
 |
2,800 |
2,800 |
1995 |
400 |
420 |
1995 |
For population <250,000. Based on purchase of building rather than leasing space. Communications includes communications equipment internal to the facility such as equipment racks, multiplexers, modems, etc. |
| Transit Center Hardware |
TR001 |
5 |
6 |
9 |
2003 |
0.12 |
0.18 |
2003 |
Includes three workstations. O&M estimated at 2% of capital cost. |
| Transit Center Software, Integration |
TR002 |
20 |
815 |
1,720 |
1995 |
6 |
12 |
1995 |
Includes vehicle tracking and scheduling, database and information storage, schedule adjustment software, real-time travel information software, and integration. Software is COTS. |
| Transit Center Additional Building Space |
TR003 |
 |
 |
 |
 |
6 |
9 |
1995 |
Additional space required for ITS technology – $12–$18/sq. ft., 500 sq. ft. |
| Transit Center Labor |
TR004 |
 |
 |
 |
 |
50 |
250 |
1995 |
Labor for three staff at $75K. Salary cost are fully loaded prices including base salary, overtime, overhead, benefits, etc. |
| Upgrade for Auto. Scheduling, Run Cutting, or Fare Payment |
TR005 |
20 |
20 |
40 |
1995 |
0.4 |
0.8 |
1995 |
Processor/software upgrade, installation and one year maintenance (for processor). Software is COTS. |
| Integration for Auto. Scheduling, Run Cutting, or Fare Payment |
TR012 |
20 |
225 |
500 |
1995 |
 |
 |
 |
Integration with other systems. |
| Further Software Upgrade for E-Fare Payment |
TR013 |
20 |
40 |
60 |
1995 |
0.8 |
1.2 |
1995 |
Software upgrade. Software is COTS. Automatic passenger counter processing software costs an additional $25K to several hundred thousand dollars depending on the system. |
| Vehicle Location Interface |
TR007 |
20 |
10 |
15 |
1995 |
 |
 |
 |
Vehicle location interface. |
| Video Monitors for Security System |
TR008 |
5 |
3 |
7 |
2003 |
0.06 |
0.14 |
2003 |
Five per site. O&M estimated at 2% of capital cost. |
| Hardware for Security System |
TR009 |
5 |
14 |
19 |
2003 |
0.28 |
0.38 |
2003 |
Includes one server and three workstations. O&M estimated at 2% of capital cost; could be higher for preventative and responsive maintenance. |
| Integration of Security System with Existing Systems |
TR010 |
20 |
250 |
500 |
1995 |
 |
 |
 |
Integration with other systems. |
| Labor for Security System |
TR011 |
 |
 |
 |
 |
202 |
247 |
1995 |
Labor for three staff at $75K each. Salary cost are fully loaded prices including base salary, overtime, overhead, benefits, etc. |