ITS Projects Book January 2003


Project Title:   ADAPTIVE CONTROL SOFTWARE (ACS) "LITE"
     
Project Status:   In Progress
     
Project Type:   Research & Development
     
Project Description:   The objective of the ACS Lite project is to provide adaptive control of traffic signals through existing closed-loop systems to meet the needs of traffic agencies operating closed loop systems. The ACS Lite project will focus on current already existing closed loop systems and enhance the master controllers selection to provide a signal-timing plan optimized for the network's current condition. This will be done by developing an ACS Lite prototype that will analyze the detector data from the intersections part of the closed loop system and create an optimized timing plan for the current traffic demands. The optimized timing plans will be sent by the ACS Lite prototype to the master controller, which will transfer these plans to the local controllers for implementation. This project will also focus on making maximum use of the infrastructure of the existing traffic control systems.
     
Project Location:   Virginia
     
Project Contractor(s):   Siemens-Gardner Transportation Systems, NEMA Manufacturers
     
Project Start Date:   February 2002
     
Project End Date:   October 2003
     
Estimated Total ITS Funds:   $998,943
     
Estimated Total Project Cost:   $998,943

Project Contacts:    
     
Felipe Luyanda-Andino
FHWA - TFHRC, HRDO-04
(202) 493-3368
Ext.



U.S. Department of Transportation, Intelligent Transportation Systems