ITS - Intelligent Transportation Systems Report ITS Home Page

Table of Contents

  1. Notice and Quality Assurance Statement
  2. Technical Report Documentation Page
  3. 1. Executive Summary
    1. WHY THE I-880 CORRIDOR WAS NOMINATED?
    2. 1.2 SCENARIOS AND STRATEGIES
    3. 1.3 EXPECTED BENEFITS and COSTS
  4. 2. References
  5. 3. Existing Corridor Scope and Operational Characteristics
    1. 3.1 Corridor Boundaries and Networks
    2. 3.2 Corridor Stakeholders
    3. 3.3 Existing Operational Conditions, Characteristics and Strategies of 880 Corridor and Included Networks
    4. 3.4 Existing Network-based Transportation Management/ITS Assets
    5. 3.5 Programmed Near-Term Network Improvements
    6. 3.6 Current Network-based Institutional Characteristics
    7. 3.7 Overview of Regional ITS Architecture
    8. 3.8 Individual Network and Corridor Problems, Issues and Needs
    9. 3.9 Corridor Management Strategies Already Implemented for the I-880 Corridor
    10. 3.10 Gaps
    11. 3.11 The Needs for ICM
  6. 4. ICM SYSTEM CONCEPT OF OPERATIONS
    1. 4.1 I-880 ICM ConOps Development Approach
    2. 4.2 I-880 Corridor Vision, Goals and Objectives
    3. 4.3 ICM Application Scenarios
    4. 4.4 Development of Candidate ICM Strategies
    5. 4.5 Analysis of Candidate ICM Strategies
  7. 5. ICM IMPLEMENTATION ISSUES
    1. 5.1 Functional Analysis
    2. 5.2 ICM New Asset Requirements and Needs
    3. 5.3 Alignment with Regional ITS Architecture
    4. 5.4 Implementation Issues
    5. 5.5 I-880 ICM Concept Implementation Institutional Framework
    6. I-880 Corridor ICM Operational Description
    7. 5.7 Availability of Detailed Real-Time Data for Evaluation
    8. 5.8 Transferability of Lessons Learned from 880 ICM Implementation to Other Metropolitan Regions
  8. APPENDIXES
    1. Appendix A: Meeting Minutes
      1. A1. Kick-off meeting minutes
      2. A2: Stakeholder meeting Jan 11, 2007
      3. A3: TAC meeting Jan 18, 2007
    2. Appendix B: Strategies
    3. Appendix C: Candidate Strategies
    4. Appendix D: ITS FUTURE PROJECT DESCRIPTION2
    5. Appendix E: Bay Area Regional Architecture Change Approval Process
    6. Appendix F. Functional Analysis
    7. Appendix G AC Transit Bus Service in the Neighborhood of 880 Corridor

Page Headers Image Source: DKS Associates