In January 1996, the Secretary of Transportation set a goal of deploying the integrated metropolitan Intelligent Transportation System (ITS) infrastructure in 75[1] of the nation's largest metropolitan areas by 2005. Using data from surveys administered to transportation agencies in major metropolitan areas since 1997, the ITS Joint Program Office rates each area as having achieved High, Medium, or Low integrated ITS deployment. The Secretary’s goal will be achieved when all of the 75 metropolitan areas are rated either High or Medium. The 2003 intermediate goal was achieved. Four metropolitan areas advanced to medium for integrated deployment in 2003 for a total of 61. The interim goal for 2004 is 68, requiring seven metropolitan areas to advance.
In January 1996, the Secretary of Transportation set a goal of deploying the integrated metropolitan Intelligent Transportation System (ITS) infrastructure in 75 of the nation's largest metropolitan areas by 2005:
"I'm setting a national goal: to build an intelligent transportation infrastructure across the United States to save time and lives, and improve the quality of life for Americans. I believe that what we do, we must measure . . . Let us set a very tangible target that will focus our attention . . . I want 75 of our largest metropolitan areas outfitted with a complete intelligent transportation infrastructure in 10 years."[2]
This paper reports the 2003 status of integrated deployment in these 75 sites and presents an estimate of progress toward fulfillment of the Secretary's goal.
Traditionally, the product of a transportation infrastructure investment consists of a fixed asset such as a highway, bridge, or public transportation vehicle developed, constructed, or purchased by a single agency. Tracking the level of deployment for such fixed assets can be accomplished by simply counting the number deployed. Measuring the deployment of the metropolitan ITS infrastructure is more complex because it consists of a set of systems, often deployed by multiple agencies, and integrated through a combination of complex institutional and technical arrangements. To track progress, it is not sufficient to simply count the number of systems deployed without first devising a measurement approach that captures the essential features of such systems in a consistent fashion across many deployment environments.
In order to track progress toward fulfillment of the Secretary's goal for integrated deployment, the U.S. Department of Transportation ITS Joint Program Office developed the metropolitan ITS deployment tracking methodology. This methodology tracks deployment of the nine components that make up the ITS infrastructure: Freeway Management; Incident Management; Arterial Management; Emergency Management; Transit Management; Electronic Toll Collection; Electronic Fare Payment; Highway-Rail Intersections; and Regional Multimodal Traveler Information. Through a set of indicators tied to the major functions of each component, the level of deployment is tracked for the 75 largest metropolitan areas. In addition, the integration links between agencies operating the infrastructure are also tracked. The details of the methodology are explained elsewhere.[3]
The Secretary's goal calls for the deployment of a "complete intelligent transportation infrastructure" in each metropolitan area. Ideally, each metropolitan area would have a locally defined set of deployment goals that constitute a "complete" deployment for the area. These locally defined deployment goals could then provide the basis for assessing how close an area is to "complete" deployment as envisioned by the Secretary's goal in a "bottom-up" fashion.
A comprehensive set of locally defined deployment goals is not currently available. Therefore, it was necessary to develop a methodology to determine the level of deployment for an area based on a "top-down" approach. A set of deployment threshold values were identified and applied across all metropolitan areas in order to categorize each metropolitan area into one of three levels of deployment: High, Medium, or Low. These threshold values were established in a way that allowed demarcation of meaningful progress toward an achievable 10-year goal. Similar thresholds were developed for rating integration.
The assignment of a single integrated deployment rating for each metropolitan area was accomplished using a three-step process. First, the current level of deployment of the ITS infrastructure components at each metropolitan area was determined. These data were compared to an established threshold level for each component to determine a deployment rating. Next, an integration rating was assigned to each area based on the degree to which its infrastructure components are integrated. Finally, the resulting ratings for deployment and integration were combined into a single overall integrated deployment rating.
Crossing a threshold value for either deployment or integration means that a metropolitan area has made a significant commitment to deploy and integrate the metropolitan ITS infrastructure. However, it does not mean that deployment or integration is complete. Figure 1 shows that, even in the High level of deployment, a metropolitan area may still have "miles to go" in completing full deployment. A significant level of investment of time and money is needed to organize and perform initial planning for metropolitan areas categorized as Low, in order to build deployment momentum. Metropolitan areas in the Medium stage are moving rapidly toward full deployment through leveraging the important initial investments in ITS infrastructure. Metropolitan areas in the High category are beginning to experience still higher rates of return on investment in ITS; however, these metropolitan areas still need continued investment to bring them up to complete deployment. In these High rated metropolitan areas, new systems are being added to an already robust infrastructure, and integration is multiplying the impact of deployments, producing more “bang for the buck.” All this adds up to a solid and expanding base for deploying the integrated infrastructure, but only with a sustained commitment of time and resources.

The process for determining the level of infrastructure deployment in a metropolitan area makes use of the indicators and threshold values contained in Table 1. A metropolitan area is rated High in component deployment if it exceeds the threshold value for at least one of the indicators in each of the five components. A metropolitan area is rated Medium in component deployment if it exceeds the threshold value for Freeway Management/Incident Management or Transit Management/Electronic Fare Payment and at least one other component. A metropolitan area is rated Low in component deployment if it exceeds the threshold value for one or fewer components.
Table 1
Component Indicators and Threshold Values Used to Measure the Presence of ITS Component Deployment
ITS Components |
Component Indicators |
Threshold Values |
|
Freeway Management/Incident Management |
% freeway miles under electronic surveillance; % freeway miles with Freeway Service Patrols; % freeway miles with CCTV |
Greater than or equal to 20% |
|
Transit Management/Electronic Fare Payment |
% buses equipped with AVL; % buses equipped with electronic fare payment |
Greater than or equal to 33% |
|
Arterial Management |
% signalized intersections under computerized control |
Greater than or equal to 33% |
|
Regional Multimodal Traveler Information |
% geographic coverage of traveler information from freeway electronic surveillance and freeway CCTV cameras[4] |
Greater than or equal to 10% |
|
Emergency Management Services |
% emergency vehicles operating under CAD |
Greater than or equal to 33% |
The level of integration in a metropolitan area is measured using a defined set of links involving the three major organizations that operate the infrastructure: states, that manage Freeway Management and Incident Management components; local governments, that manage most of the Arterial Management components; and public transit authorities, that manage the Transit Management component. A link is considered present if any integration indicator connecting agencies has a value greater than zero. These indicators involve real-time operational coordination and include: sharing information with other agencies on traffic conditions or incidents by arterial or freeway agencies, provision for transit vehicles to obtain priority at arterial traffic signal or freeway ramp meters, and the use of transit vehicles as probes on arterials or freeways. An integration level of High is assigned to a metropolitan area if all three links are present. An integration level of Medium is assigned if any two out of three links are present. An integration level of Low is assigned if one or fewer links are present.
The two High/Medium/Low classifications for both integration and component deployment are combined into a single High/Medium/Low category using the rules contained in Table 2.
Combined High/Medium/Low
Classification Scheme
Component Classification |
Integration Classification |
Combined Classification |
|
High |
High |
High |
|
High |
Medium |
Medium |
|
High |
Low |
Medium |
|
Medium |
High |
High |
|
Medium |
Medium |
Medium |
|
Medium |
Low |
Low |
|
Low |
High |
Medium |
|
Low |
Medium |
Medium |
|
Low |
Low |
Low |
In order to obtain the data needed to support this methodology, transportation agencies in the 75 metropolitan areas being tracked were surveyed concerning deployment and integration. Data were gathered in separate national survey efforts conducted in four years: 1997, 1999, 2000, and 2002. There was no national survey in 1998, 2001, and 2003. To track goal progress in the years without a national survey, a limited telephone survey was conducted in 2001, and repeated in 2003. These telephone surveys were limited to agencies in the metropolitan areas that had received a rating of Low for integrated deployment. The results of these data gathering efforts are shown in Figure 2.
Figure 2 shows that in 2003, four metropolitan areas advanced from an overall Low rating. A total of 14 metropolitan areas are categorized as Low with 61 areas rated Medium or High. This can be contrasted with the 1997 deployment baseline in which 39 areas were characterized as Low, 25 as Medium, and 11 as High.
Table 3 lists the 75 metropolitan areas and their respective level of integrated deployment for 1997, 1999, 2000, 2001, 2002, and 2003. As previously discussed, these ratings combine information concerning deployment and integration into a single overall measure. Areas with a High or Medium level of integrated deployment in 2003 are listed at the top of the table, followed by areas with a Low level of integrated deployment. The four metropolitan areas advancing to Medium are in bold.
Table 3
Metropolitan Areas
and Their Respective Level of Integrated Deployment
|
Metropolitan Area |
Integrated-Deployment
Level |
|||||
|
1997 |
1999 |
2000 |
2001* |
2002 |
2003* |
|
|
Atlanta, GA |
High |
High |
High |
|
High |
|
|
Albany,
Schenectady, Troy, NY |
Low |
Med |
Med |
|
High
|
|
|
Baltimore, MD |
Med |
High |
High |
|
High |
|
|
Buffalo, Niagara
Falls, NY |
Med |
Med |
Med |
|
High |
|
|
Charlotte, Gastonia, NC; Rock Hill, SC |
Med |
High |
High |
|
High |
|
|
Chicago, Lake County, IL; Gary, IN |
Med |
High |
High |
|
High |
|
|
Cincinnati, Hamilton, OH |
High |
High |
High |
|
High |
|
|
Dallas, Fort Worth, TX |
Med |
High |
High |
|
High |
|
|
Detroit, Ann Arbor, MI |
Med |
High |
High |
|
High |
|
|
Greensboro, Winston-Salem, High Point, NC |
Low |
High |
High |
|
High |
|
|
Houston, Galveston, Brazoria, TX |
High |
High |
High |
|
High |
|
|
Jacksonville, FL |
Med |
Med |
High |
|
High |
|
|
Los Angeles, Anaheim, Riverside, CA |
High |
High |
High |
|
High |
|
|
Miami, Fort Lauderdale, FL |
Med |
Med |
High |
|
High |
|
|
Milwaukee, Racine, WI |
Med |
High |
High |
|
High |
|
|
Minneapolis, St. Paul, MN |
High |
High |
High |
|
High |
|
|
New York, NY; Northern New Jersey, NJ; Southwestern Connecticut, CT |
High |
High |
High |
|
High |
|
|
Orlando, FL |
Med |
High |
High |
|
High |
|
|
Philadelphia, PA; Wilmington, DE; Trenton, NJ |
Med |
High |
High |
|
High |
|
|
Phoenix, AZ |
High |
High |
High |
|
High |
|
|
Portland, OR; Vancouver, WA |
High |
High |
High |
|
High |
|
|
Salt Lake City,
Ogden, UT |
Low |
Med |
Med |
|
High
|
|
|
San Antonio, TX |
Med |
High |
High |
|
High |
|
|
San Diego, CA |
High |
High |
High |
|
High |
|
|
San Francisco, Oakland, San Jose, CA |
Med |
High |
High |
|
High |
|
|
Seattle, Tacoma, WA |
High |
High |
High |
|
High |
|
|
Washington, DC |
High |
High |
High |
|
High |
|
|
Allentown, Bethlehem, Easton, PA |
Med |
Med |
Med |
|
Med |
|
|
Austin, TX |
Med |
Med |
Med |
|
Med |
|
|
Bakersfield, CA |
Low |
Low |
Low |
Low |
Med
|
|
|
Baton Rouge, LA |
Low |
Low |
Med |
|
Med |
|
|
Boston, Lawrence, Salem, MA |
Med |
Med |
Med |
|
Med |
|
|
Birmingham, AL |
Low |
Low |
Med |
|
Med |
|
|
Cleveland, Akron, Lorain, OH |
Med |
Med |
Med |
|
Med |
|
|
Denver, Boulder, CO |
Med |
Med |
Med |
|
Med |
|
|
El Paso, TX |
Low |
Low |
Low |
Low |
Med
|
|
|
Fresno, CA |
Low |
Low |
Low |
Low |
Med
|
|
|
Grand Rapids, MI |
Low |
Low |
Low |
Low |
Med |
|
|
Hampton Roads, VA |
Med |
Med |
Med |
|
Med |
|
|
Harrisburg, Lebanon, Carlisle, PA |
Low |
Med |
Med |
|
Med |
|
|
Hartford, New Britain, Middletown, CT |
Low |
Med |
Med |
|
Med |
|
|
Kansas City, MO |
Low |
Low |
Med |
|
Med |
|
|
Memphis, TN |
Med |
Med |
Med |
|
Med |
|
|
New Haven, Meriden, CT |
Med |
Med |
Med |
|
Med |
|
|
New Orleans, LA |
Low |
Med |
Med |
|
Med |
|
|
Omaha, NB |
Low |
Low |
Low |
Low |
Med
|
|
|
Pittsburgh, Beaver Valley, PA |
Med |
Med |
Med |
|
Med |
|
|
Providence, Pawtucket, RI; Fall River, MA |
Low |
Med |
Med |
|
Med |
|
|
Raleigh-Durham, NC |
Med |
Med |
Med |
|
Med |
|
|
Richmond, Petersburg, VA |
Low |
Med |
Med |
|
Med |
|
|
Rochester, NY |
Med |
Med |
Med |
|
Med |
|
|
Sacramento, CA |
Med |
Med |
Med |
|
Med |
|
|
Scranton, Wilkes-Barre, PA |
Low |
Med |
Med |
|
Med |
|
|
St. Louis, MO |
Low |
Med |
Med |
|
Med |
|
|
Tampa, St. Petersburg, Clearwater, FL |
Low |
Med |
Med |
|
Med |
|
|
Tucson, AZ |
Low |
Med |
Med |
|
Med |
|
|
West Palm Beach, Boca Raton, Delray, FL |
Low |
Med |
Med |
|
Med |
|
|
Charleston, SC |
Low |
Low |
Low |
Low |
Low |
Med |
|
Columbus, OH |
Low |
Low |
Low |
Low |
Low |
Med |
|
Nashville, TN |
Low |
Low |
Low |
Low |
Low |
Med |
|
Greenville,
Spartanburg, SC |
Low |
Low |
Low |
Low |
Low |
Med |
|
Dayton, Springfield, OH |
Low |
Low |
Low |
Low |
Low |
Low |
|
Honolulu, HI |
Low |
Low |
Low |
Low |
Low |
Low |
|
Indianapolis, IN |
Low |
Low |
Low |
Low |
Low |
Low |
|
Knoxville, TN |
Low |
Low |
Low |
Low |
Low |
Low |
|
Las Vegas, NV |
Low |
Low |
Low |
Low |
Low |
Low |
|
Little Rock, North Little Rock, AR |
Low |
Low |
Low |
Low |
Low |
Low |
|
Louisville, KY |
Low |
Low |
Low |
Low |
Low |
Low |
|
Oklahoma City, OK |
Low |
Low |
Low |
Low |
Low |
Low |
|
Springfield, MA |
Low |
Low |
Low |
Low |
Low |
Low |
|
Syracuse, NY |
Low |
Low |
Low |
Low |
Low |
Low |
|
Toledo, OH |
Low |
Low |
Low |
Low |
Low |
Low |
|
Tulsa, OK |
Low |
Low |
Low |
Low |
Low |
Low |
|
Wichita, KS |
Low |
Low |
Low |
Low |
Low |
Low |
|
Youngstown, Warren, OH |
Low |
Low |
Low |
Low |
Low |
Low |
* 2001 and 2003 ratings are based on a telephone survey of metropolitan areas rated Low in 2000 and 2002. Cities ranked Medium and High in 2000 and 2002 were not evaluated in 2001 and 2003 and were not assigned a ranking in those years.
The measurement of progress for 2003 can be set in the context of yearly goals leading to achievement of the Secretary's 2005 integrated deployment goal. Figure 3 compares the level of integrated deployment measured in 1997, 1999, 2000, 2001, 2002, and 2003 to goals for deployment for each year through 2005. No data were collected in 1998; therefore, only the goal levels of integrated deployment are shown for 1998. In 2003, four metropolitan areas advanced from Low to Medium. To meet the interim goal, the number of metropolitan areas rated Low needed to fall to 14 in 2003; which was achieved.

Figure 3. Deployment Goals and Actual Deployment Levels for 75 Metropolitan Areas
This paper documents progress toward fulfillment of the Secretary's goal of deploying a complete intelligent transportation infrastructure in 75 of the nation's largest metropolitan areas by 2005. The methodology for measuring this progress has been described along with the 2003 status of deployment. The methodology relies on a "top-down" approach to goal setting absent a set of "bottom-up" goals for each metropolitan area. The results indicate that, while a significant level of progress has been made, even among deployment leaders there are still "miles to go" before a complete infrastructure is deployed. The 2003 results indicate that the yearly goal for having metropolitan areas in the Medium or High rating was achieved. The next complete survey of all metropolitan areas will occur in 2004.
[1] Since the Secretary of Transportation’s speech, the number of metropolitan areas that DOT will measure has been increased from 75 to 78. However, to maintain reporting consistency across the 10-year goal period, this report considers only the original 75 metropolitan areas.
[2] Excerpt of a speech delivered by the Secretary of Transportation at the Transportation Research Board in Washington, DC on January 10, 1996.
[3] U.S. DOT(1999). “Measuring ITS Deployment and Integration. http://www.itsdocs.fhwa.dot.gov//JPODOCS/REPTS_TE/3DG01!.PDF, EDL#4372.”
[4] In 2003, the definition of coverage for traveler information was expanded to include the coverage of freeway CCTV where travelers have access to the CCTV images through the Internet or other means.